Facing the success and client’s conformity with the modular construction, Tecno Fast ATCO signs a second contract with Spence Mining for the construction, assembly and commissioning of several infrastructure buildings.
Among the buildings, warehouses and workshops were built with metallic buildings consisting of two main sheds containing the general warehouse area, workshops and a geology warehouse with a total surface of 3,594 m²; both buildings were equipped with a fire detection and extinguishing systems, complemented with 10-ton overhead cranes, products storage system, paved and fenced patios, a rack for the sample patio, and complementary facilities for the sampling process.