In Gabon, for 224 workers of the mine Rabi Phase III, from Shell. Hired by Sodexho International, it is an 899 m² building with 16 dormitory modules plus 4 common restroom modules. Plus, an additional deck structure that allows to lower the building’s inner temperature (40 °C on the outside), projected over the panel base of the metallic structure. The manufacturing was done in 30 days, including engineering, and assembly in 35 days.