Mina Gaby needed to have their laboratory up and running in a short time, thus Tecno Fast ATCO, along with their engineering staff, were the ones in charge with designing and building a laboratory that not only hosted chemical processes but also offices, meeting rooms and storage rooms, to ensure the structure’s maximum functioning in the shortest time possible.