Tecno Fast through its long history has received national and international awards of different kinds, standing out in the MBI (Modular Building Institute) awards and in the CChC (Chilean Chamber of Construction) for the design of our Website.
Safety recognition for 500,000 man-hours without accidents with time loss (December, 1999).
For having achieved the construction works in Los Pelambres project without accidents with time loss (August, 1998).
Tecno Fast was awarded for best website of the construction sector, granted by the CChC (Chilean Construction Chamber).
2001 First Place: Temporary Factory-Built Complex of Buildings
2002 Honorable Mention: Permanent Factory-Built Institutional or Assembly over 5000sq. ft
2002 Honorable Mention: Marketing Piece Print
2004 Honorable Mention: Permanent Factory-Built Institutional or Assembly over 5000sq. ft
2004 First Place : Temporary Factory -Built Institutional or Assembly over 5000 sq.ft
2007 First Place : Permanent Modular Office over 10,000sq.ft
2008 First Place: Permanent Modular Institutional Or Assembly Over 5000 sq.ft
2008 First Place: Permanent Modular Office Over 10,000 sq.ft
2009 First Place: Temporary Modular Single-Wide
2011 Honorable Mention: Permanent Modular HealtCare
2011 First Place: Permanent Modular Retail Or Hospitality
2012 Honorable Mention: Permanent Modular Office Over 10,000 sq.ft
2016 First Place: Marketing Place Print
2016 Honorable Mention: Marketing Piece Website
2016 Honorable Mention: Permanent Modular Bathroom Pod
2016 Honorable Mention: Relocatable Modular Retail or Hospitality
2017 Honorable Mention: Relocatable Modular Single-Wide
2017 Honorable Mention: Relocatable Modular HealthCare
2018 Honorable Mention: Renovated Reuse Greatest Renovation - Alto Maipo
2019 Honorable Mention: Relocatable Modular Hotel - Hotel Tecno Fast Village Calama
2019 First Place: Relocatable Modular Workforce Housing Over 10.000 Sq. Ft. - Spence SGO Camp
2020 First Place: Relocatable modular Hotel - Tiny Cabin
2020 Honorable Mention: Relocatable Modular Workforce Housing - El Tambo Camp
2020 Honorable Mention: Marketing Piece Multimedia - Video institucional
2021 Honorable Mention: Relocatable Health Care Under 10.000 - Hospital Backus
2021 First Place: Permanent Workforce Housing Over 800 Pax - Antamina
2021 First Place: Relocatable Workforce Housing Over 10.000 - Quebrada Blanca, Fase II, Concentradora
2021 First Place: Special Application or Single Wide - Hobe
2021 Best of Show - Hobe
2022 First Place - Relocatable ModularHealthcare over 10,000 sq.ft San Borja - Tecnofast
2022 First Place - Relocatable Modular Workforce Housing MEL - Tecnofast
2022 Honorable Mention - Permanent ModularSpecial Application SAG, CanilesModulares - Tecnofast
2022 Honorable Mention - Permanent ModularSpecial Application SAG, CanilesModulares - Tecnofast
2022 First Place - Relocatable ModularOffice Over 13,000 sq. ft - Officesscientific research organization. TRIUMPH
2022 First Place - Permanent Dorm under4,000 sq.ft - Fire Station. - TRIUMPH
Tecno Fast was recognized as one of the Best Chilean Companies, according to the 2020-2021 measurement carried out by Deloitte together with Banco Santander and the Adolfo Ibáñez University.
The initiative seeks to distinguish the good practices that national companies are implementing through the evaluation by a panel of experts of four key pillars: strategy; capabilities and innovation; culture and commitment; and corporate governance and finance.
Tecno Fast fue reconocida por segundo año consecutivo como una de las Mejores Empresas Chilenas, según la medición 2021-2022 que realizó Deloitte junto con Banco Santander y la Universidad Adolfo Ibáñez.
“Ser reconocidos por segundo año consecutivo con esta distinción nos enorgullece por el trabajo y la dedicación que todos los miembros del equipo de Tecno Fast realizamos diariamente. Es una señal de que nuestro compromiso con la eficiencia, la calidad y el servicio siguen marcando la esencia de nuestro trabajo”
Certificate of OUTSTANDING MANAGEMENT (2008), valid until June 2010.
165,000 man-hours without accidents with time loss (May, 2009) • Mutual de Seguridad CChC achieved 630,000 man-hours without disabling accidents in its 2008 – 2009 La Escondida Site projects (August, 2009).
In March 2012, Tecno Fast took a huge leap in Safety, Occupational Health, and Environmental Care. After a hard but satisfactory process, since we could see the progress in our commitment with our people’s safety and environmental care, TFA became the first modular construction company with THREE CERTIFICATIONS, currently holding the ISO 9001, ISO 14001, and OHSAS 18001 certifications, which makes our company a World-Class Company.
May 4, 2012, was not just another day for TFA, since the project in Collahuasi achieved the very important one-million-man-hours-without-accidents-with-time-loss milestone, showing once again the value that TFA allocates to workers protection, being this the result of a series of actions, activities, and commitments carried out towards risk prevention and environmental care. 1 year without accidents with time loss in Rental Plant. Although our Rental plant’s lifespan is different to our older Lampa plant, it is already satisfying us through the achievement of June 23, 2012, making us feel proud of the 1 year-without-accidents-with-time-loss milestone, and reflecting our commitment with our workers’ safety.
The Quebrada Blanca Project built by Tecno Fast is located at 4,500 m.a.s.l. Its work started on November 7, 2011, and achieved 500,000 man-hours without accidents with time loss on December 14, 2012. This project was developed under very unique weather conditions, which makes this milestone even more relevant, since our workers faced extreme temperatures between -5°C and +13°C (23°F and 55°F), and changing weather conditions during the day, from a clear sky to hail or electric storms within minutes, which may cause lightnings striking on the facilities. The average number of workers in this project is 400, considering 30,483 m2 in total, which includes one dining room with a 700 people capacity, 1 gym, office premises, and 1,700 beds.
Tecno Fast — having presence in Minera Escondida Ltda. since 1997 with projects such as OGP1, Campamento 2000, San Lorenzo Village, Leaching, BHP Billiton’s SX, among others — achieved a very important 3 million-man-hours-without-accidents-with-time-loss milestone in December, 2012, which is an irrefutable result of the commitment with risk prevention and environmental care of both TFA and its collaborator companies. According to Alvaro Ahumada, SSOMA CEO, this milestone is the result of the contribution of each worker on their own and their coworkers’ benefit, led by an interdisciplinary team of risk preventionists, Sernageomin, environmental engineers, and psychologists with vast experience in La Escondida, who everyday do their best towards our workers’ safety. Currently, the surface built by TFA in La Escondida accounts for approximately 140,700 m2.
Tecno Fast was awarded for good performance in safety, during a contract execution in Collahuasi.
These are Tambo, which with its almost 16,000 additional square meters will have a capacity of 1,854 beds, and Concentradora, a camp that will add just over 45,000 square meters, which translates into 4,092 beds.
This milestone involved the construction of 1,346 modules totaling more than 60 thousand square meters, which is equivalent to six soccer fields. Likewise, it involved the completion of 2,150 trips totaling 8.1 million kilometres.